Solve any four question from Q.1(a, b, c,d, e)
1(a)
What are the characteristics of a good wage system?
5 M
1(b)
What are the factors influencing plant layout?
5 M
1(c)
What are the different methods of depreciation?
5 M
1(d)
What are the different time study equirements?
5 M
1(e)
How is a system approach useful in I.E.?
5 M
2(a)
Define Productivity. What are the different techniques to improve productivity?
10 M
2(b)
What is a FAST diagram? Construct a FAST diagram for a ball point pen.
10 M
3(a)
What are the principles of motion economy?
10 M
3(b)
What are the different methods of merit rating?
10 M
4(a)
What is anthropometry How is anthropometry data used in design?
10 M
4(b)
The workmen in an engineering firm are expected to work for 400 minnutes in a shift of 8 hours. The remaining time is meant for rest and personal needs, etc.
i) Estimate the standard time per piece of a job whose normal time is 2 minutes.
ii) Find number of pieces to be produced per day.
iii) If the workmen engaged on the above job produced 180 pieces in the shift. What is their efficiency?
i) Estimate the standard time per piece of a job whose normal time is 2 minutes.
ii) Find number of pieces to be produced per day.
iii) If the workmen engaged on the above job produced 180 pieces in the shift. What is their efficiency?
10 M
5(a)
What are the different types of plant layout? What are their advantages and disadvantages
10 M
5(b)
Why does money have a time value? Explain the basic time value of money model with four varibles involved in it.
10 M
Write short note any four question from Q.6(a, b, c, d, e)
6(a)
Financial Statements.
10 M
6(b)
Assembly line balancing
10 M
6(c)
BPR
10 M
6(d)
PMTS.
10 M
More question papers from Industrial Engineering & Management