Solve any four questionQ.1(a,b,c,d,e)
1(a)
What are the different techniques of Industrial Engineering?
5 M
1(b)
What is a multiple activity chart?
5 M
1(c)
Define the term ergonomics? What are its objectives?
5 M
1(d)
What is the importance of material handling? What are the different types of material handling equipment?
5 M
1(e)
What do you understand bv time value of money?
5 M
2(a)
What are the factors influencing productivity?
8 M
2(b)
What are the steps to be considered in value analysis? Explain with the help of an example.
8 M
2(c)
What was the contributions of different researchers to Industrial Engineering?
4 M
3(a)
What are the the steps involved in micromotion study?
8 M
3(b)
What are incentive schemes? What are the characteristics of good incentive scheme?
8 M
3(c)
What is the difference between value engineering and value analysis?
4 M
4(a)
An operation involves the following elements given below with their related data.
Assuming rest and personal allowances as 13% and contingency allowances as 2% calculate standard time of the job.
Element | Observed time(minutes) | Rating | Remarks |
A | 0.20 | 90 | - |
B | 0.05 | 80 | - |
C | 0.03 | 100 | - |
D | 0.78 | 100 | - |
E | 0.06 | 100 | - |
F | 0.05 | 100 | - |
G | 0.02 | 85 | Once in 5 pieces |
H | 0.06 | 80 | - |
I | 0.10 | 90 | - |
J | 0.04 | 90 | Once in 20 pieces |
8 M
4(b)
What do you understand by job evaluation? What are its objectives?
8 M
4(c)
What are the different methods of depreciation?
4 M
5(a)
Following table shows the Cash Flow (Rs.) for a certain project for its respective years.
Find:-
i) If the project is acceptable by NPV method considering discount rate as 10%.
ii) For the same project, the discount rate by IRR method.
Year | 0 | 1 | 2 | 3 | 4 | 5 |
Cash Flow | 10,00,000 | 2,00,000 | 2,00,000 | 3,00,000 | 3,00,000 | 3,50,000 |
i) If the project is acceptable by NPV method considering discount rate as 10%.
ii) For the same project, the discount rate by IRR method.
10 M
5(b)
What are the different types of plant layout? What are their advantages and disadvantages?
10 M
6
Write short note on :- a) Assembly line balancing
b) PMTS
c) Elements of cost
d) Cyclegraph and chrono cyclegraph
b) PMTS
c) Elements of cost
d) Cyclegraph and chrono cyclegraph
20 M