1 (a)
Justify any guidelines of metric with respect to your project of choice. Explain it with suitable diagram.
10 M
1 (b)
How would you reduce the maintenance cost of software and increase the re-usability of above project of choice.
10 M
2 (a)
Design a RMMM plan for a database project. Explain the plan with at least five risks and analysis the same.
10 M
2 (b)
What is the importance of change control? Explain it with configuration items and baselines.
10 M
3 (a)
What are the different tasks of software configuration management?
10 M
3 (b)
Justify the requirement of object oriented software engineering. Which tests play important role in object oriented context?
10 M
4 (a)
List and explain the fundamental concepts for software design.
10 M
4 (b)
Which tests are carried out during verification and validation? Explain in detail.
10 M
5 (a)
Explain the different techniques of software requirement analysis.
10 M
5 (b)
Discuss the software project planning with the help of SRS.
10 M
6 (a)
List and explain the activities of version control.
10 M
6 (b)
Explain basis path testing and cyclometric complex with example and diagram.
10 M
Write short notes on (any two)
7 (a)
User interface design principles
10 M
7 (b)
Empirical estimation model
10 M
7 (c)
CMM
10 M