1 (a) Justify any guidelines of metric with respect to your project of choice. Explain it with suitable diagram.
10 M
1 (b) How would you reduce the maintenance cost of software and increase the re-usability of above project of choice.
10 M

2 (a) Design a RMMM plan for a database project. Explain the plan with at least five risks and analysis the same.
10 M
2 (b) What is the importance of change control? Explain it with configuration items and baselines.
10 M

3 (a) What are the different tasks of software configuration management?
10 M
3 (b) Justify the requirement of object oriented software engineering. Which tests play important role in object oriented context?
10 M

4 (a) List and explain the fundamental concepts for software design.
10 M
4 (b) Which tests are carried out during verification and validation? Explain in detail.
10 M

5 (a) Explain the different techniques of software requirement analysis.
10 M
5 (b) Discuss the software project planning with the help of SRS.
10 M

6 (a) List and explain the activities of version control.
10 M
6 (b) Explain basis path testing and cyclometric complex with example and diagram.
10 M

Write short notes on (any two)
7 (a) User interface design principles
10 M
7 (b) Empirical estimation model
10 M