1 (a)
Is agile process suitable for large scale projects? Mention few issues.
5 M
1 (b)
Explain process framework.
5 M
1 (c)
Mention SQA activities.
5 M
1 (d)
Explain CMM level 4 and level 5.
5 M
2 (a)
Mention the reasons for project delay. What are the risks associated with project delay?
10 M
2 (b)
Estimate the effort using function point method to design a user interface for the public to report about damaged pathole. Assume suitable input complexity and justify your assumptions.
10 M
3 (a)
Explain in detail Spiral model and compare it with component model.
10 M
3 (b)
Explain architectural design for e-Commerce System.
10 M
4 (a)
Prepare SRS for the Course Management System.
10 M
4 (b)
List down the activities required for scheduling and tracking software projects.
10 M
5 (a)
Describe in detail white box techniques.
10 M
5 (b)
Draw use case sequence diagram (withdrawal) for ATM banking system.
10 M
6 (a)
In a car service station, complaints are taken and an estimate of the work is given immediately. Resources are assigned to the job. Once repaired a bill is prepared for actual cost. Prepare a DFD up to level 2 and make a sample entry in data dictionary for each element.
10 M
6 (b)
Explain how are change control and version control are carried out.
10 M