MU Information Technology (Semester 6)
Software Engineering
December 2015
Total marks: --
Total time: --
INSTRUCTIONS
(1) Assume appropriate data and state your reasons
(2) Marks are given to the right of every question
(3) Draw neat diagrams wherever necessary


1 (a) Is agile process suitable for large scale projects? Mention few issues.
5 M
1 (b) Explain process framework.
5 M
1 (c) Mention SQA activities.
5 M
1 (d) Explain CMM level 4 and level 5.
5 M

2 (a) Mention the reasons for project delay. What are the risks associated with project delay?
10 M
2 (b) Estimate the effort using function point method to design a user interface for the public to report about damaged pathole. Assume suitable input complexity and justify your assumptions.
10 M

3 (a) Explain in detail Spiral model and compare it with component model.
10 M
3 (b) Explain architectural design for e-Commerce System.
10 M

4 (a) Prepare SRS for the Course Management System.
10 M
4 (b) List down the activities required for scheduling and tracking software projects.
10 M

5 (a) Describe in detail white box techniques.
10 M
5 (b) Draw use case sequence diagram (withdrawal) for ATM banking system.
10 M

6 (a) In a car service station, complaints are taken and an estimate of the work is given immediately. Resources are assigned to the job. Once repaired a bill is prepared for actual cost. Prepare a DFD up to level 2 and make a sample entry in data dictionary for each element.
10 M
6 (b) Explain how are change control and version control are carried out.
10 M



More question papers from Software Engineering