1 (a)
Enlist and explain the steps required to perform cost estimation using COCOMO model.
10 M
1 (b)
Give a software requirement specification for developing a software for payroll management system
10 M
2 (a)
Explain Software Configuration Management and Change Control Management in detail.
10 M
2 (b)
Explain CMM along with activities with each level.
10 M
3 (a)
Explain how Gantt chart can be used for planning and controlling for small project with examples. What are the limitations of Gantt chart?
10 M
3 (b)
Explain risk identification, risk projection and RMMM plan in detail.
10 M
4 (a)
What do you understand by quality assurance? Explain the levels of quality assurance.
10 M
4 (b)
Explain basic path testing and Cyclomatic complexity in detail
10 M
5 (a)
Compare conventional approach and object oriented approach to software development? What are the advantages of OOAD?
10 M
5 (b)
What is feasible study? Explain its types, contents and purpose.
10 M
6 (a)
Explain how project scheduling and tracing is done for a software development project.
10 M
6 (b)
Describe data flow and control flow diagram with suitable example.
10 M
Distinguish between:-
7 (a)
White box and black box testing.
5 M
7 (b)
Coupling and cohesion.
5 M
7 (c)
RAD and spiral model.
5 M
7 (d)
FP and LOC based cost estimation.
5 M
More question papers from Software Engineering