MU Civil Engineering (Semester 7)
Quantity Survey, Estimation and Valuation
December 2014
Total marks: --
Total time: --
INSTRUCTIONS
(1) Assume appropriate data and state your reasons
(2) Marks are given to the right of every question
(3) Draw neat diagrams wherever necessary


1 Work out the quantities of the following items of work by referring plan & section shown in Fig.1
a) P.C.C(1:2:4) in foundation.
b) 1 st Class brickwork in foundation in C.M(1:4)
c) 2.5 cm thick D.P.C(1:3:6)
d) 12 mm thick internal plaster in C.M(1:5)

Schedule of openings :-

Doors Windows
D1 = 1.1 m × 2.1 m W1 = 2.0 m × 1.3 m
D2 = 1.0 m × 2.1 m W2 = 1.8 m × 1.3 m
D3 =0.9 m × 2.1 m W3 = 1.5 m × 0.8 m
O = 1.2 m × 2.1 m V = 0.6 m × 0.4 m


 

Wall Thickness = 300 mm
Plinth level = 600 mm
Floor to floor height = 3000 mm
Slab thickness = 120 mm

20 M

2 (a) Prepare an approximate estimate for (G+4) R.C.C building. Bldg consist of six flats on each floor & each flat has carpet area of 110m2. Assume area occupied by walls & columns etc. As 10% of built up area of circulation as 20% of built up area. Assume cost of construction as Rs 10000/m2.
10 M
2 (b) Prepare abstract of cost for the items in Q no 1.
6 M
2 (c) What is Tender Notice? Mention main inclusions of it.
4 M

3 (a) What is contract? Explain the types of contract with their suitability.
12 M
3 (b) Prepare rate analysis for 1 st class brickwork in super structure in C.M(1:4)
8 M

4 (a) Work out the quantity of earthwork for a portion of a road
1) Top width of formation=12m
2) RL of formation at zero chainage=51.4m
3) Falling Gradient=1 in 200
4) Side slope-1V:2H(Banking )1V:1.5H(Cutting)
Chainage 0 30 60 90 120 150 180
R.L of Gr.(m) 50.8 80.6 50.7 51.2 51.4 51.3 51
12 M
Explain
4 (b) (i) Mass Haul Diagram.
4 M
4 (b) (ii) Prismoidal formula & Trapezodial formula.
4 M

Explain
5 (a) (1) Eamest money deposit & Security Deposit.
4 M
5 (a) (2) Liquidated Damages and unliquidated damages.
4 M
5 (a) (3) Freehold properties & Leasehold properties.
4 M
5 (b) Explain Belting Method of Valuation in detail.
8 M

6 (a) A building is newly constructed with cost of Rs.1 Crore over a plot of land costing Rs.70 lacs Building Consists of 20 flats of area 120M2 each work out monthly standard rent/ flat from the following data :
1) Expected net return from land & building=7%
2) Rate of interest on sinking fund=9%
3) Life of building=60 years.
4) Salvage value=10% of cost of building cost.
5) Repairs & maintenance cost=7% of building cost.
6) Taxes & other outgoings=25% of gross rent.
10 M
6 (b) What is bar bending schedule? Why it is prepared? Explain clearly along with its proforma.
6 M
Explain
6 (c) (i) Pre-bid conference.
2 M
6 (c) (ii) Debitable agency.
2 M

Write short note on (any four)
7 (a) Escalation clause.
5 M
7 (b) C.B.R.I method.
5 M
7 (c) I.S. 1200
5 M
7 (d) Freehold properties & Leasehold properties.
5 M
7 (e) Use of computers in Estimation process.
5 M