1 (a)
Discuss Business Process Re-engineering in brief.
7 M
1 (b)
Explain ISO 14000 with its benefits and barriers.
7 M
2 (a)
Write a short note on views of different quality Gurus.
7 M
Answer any two question from Q2 (b) or Q2 (c)
2 (b)
Explain 7 New Quality Improvement tools.
7 M
2 (c)
Discuss TQM implementation and limitations.
7 M
Answer any two question from Q3 (a), (b) or Q3 (c), (d)
3 (a)
Explain different steps in experimental design.
7 M
3 (b)
Explain KANBAN system in brief.
7 M
3 (c)
Write a short note on Taguchi approach.
7 M
3 (d)
Write a short note on Just In Time system.
7 M
Answer any two question from Q4 (a), (b) or Q4 (c), (d)
4 (a)
Discuss advantages and disadvantages of Total Productive Maintenance,
7 M
Write a short note on:
4 (b) (i)
Bench marking.
3 M
4 (b) (ii)
Agile manufacturing.
4 M
4 (c)
Explain six sigma technique in brief
7 M
Write a short note on:
4 (d) (i)
Quality Assurance.
3 M
4 (d) (ii)
Quality Management.
4 M
Answer any two question from Q5 (a), (b) or Q5 (c), (d)
5 (a)
Define 1) Quality 2) Inspection 3) Failure rate 4) Quality Control 5) Failure density 6) MTTF 7)MTTR
7 M
5 (b)
One thousand steel pins with the specification of 10+0.015,10.70-0.010 diameter were obtained and the data was recorded follows:
1) Find the Arithmetic mean and standard deviation
2) Interpret the results on the basis of Normal distribution and suggest the change if any.
Diameter in mm | No of Pins |
10.60 - 10.65 | 05 |
10.65 - 10.70 | 10 |
10.70 - 10.75 | 30 |
10.75 - 10.80 | 35 |
10.80 - 10.85 | 17 |
10.85 - 10.90 | 03 |
1) Find the Arithmetic mean and standard deviation
2) Interpret the results on the basis of Normal distribution and suggest the change if any.
7 M
Write a short note on:
5 (c) (i)
Histogram.
3 M
5 (c) (ii)
Normal Distribution Curve.
4 M
5 (d) (i)
Failure Data Analysis.
3 M
5 (d) (ii)
Mortality Curve.
4 M