MU Instrumentation Engineering (Semester 8)
Instrumentation Project Documentation and Execution
December 2015
Instrumentation Project Documentation and Execution
December 2015
Answer the following (Any Four):
1 (a)
Explain the role of constructor.
5 M
1 (b)
Define project and explain project structure with the help of success triangle.
5 M
1 (c)
Discuss in details advantages of using software package for documentation.
5 M
1 (d)
Prepare system integration service checklist require in design and deploying a control package.
5 M
1 (e)
Draw any ten ISA symbol.
5 M
2 (a)
Explain the project flow in details.
10 M
2 (b)
Explain specification sheet for DP transmitter and control valve.
10 M
Explain the following:
3 (a) (i)
Logic Diagram
5 M
3 (a) (ii)
Conduit and tray schedule
5 M
3 (b)
Explain CFC and SFC in short.
10 M
4 (a)
Draw and explain Hook up diagram for any two instruments.
10 M
4 (b)
Describe the checkout procedure for temperature transmitter.
10 M
5 (a)
Draw and explain instrument location plan with example.
10 M
5 (b)
Explain in short HMI specification
10 M
6 (a)
Explain DCS and SCADA graphics.
10 M
6 (b)
Describe the different Standards used for instrumentation project.
10 M
Write a short note on any two:
7 (a)
Project Deliverable.
10 M
7 (b)
Commissioning
10 M
7 (c)
Software packages for Documentation.
10 M