MU Instrumentation Engineering (Semester 8)
Instrumentation Project Documentation and Execution
December 2015
Total marks: --
Total time: --
INSTRUCTIONS
(1) Assume appropriate data and state your reasons
(2) Marks are given to the right of every question
(3) Draw neat diagrams wherever necessary


Answer the following (Any Four):
1 (a) Explain the role of constructor.
5 M
1 (b) Define project and explain project structure with the help of success triangle.
5 M
1 (c) Discuss in details advantages of using software package for documentation.
5 M
1 (d) Prepare system integration service checklist require in design and deploying a control package.
5 M
1 (e) Draw any ten ISA symbol.
5 M

2 (a) Explain the project flow in details.
10 M
2 (b) Explain specification sheet for DP transmitter and control valve.
10 M

Explain the following:
3 (a) (i) Logic Diagram
5 M
3 (a) (ii) Conduit and tray schedule
5 M
3 (b) Explain CFC and SFC in short.
10 M

4 (a) Draw and explain Hook up diagram for any two instruments.
10 M
4 (b) Describe the checkout procedure for temperature transmitter.
10 M

5 (a) Draw and explain instrument location plan with example.
10 M
5 (b) Explain in short HMI specification
10 M

6 (a) Explain DCS and SCADA graphics.
10 M
6 (b) Describe the different Standards used for instrumentation project.
10 M

Write a short note on any two:
7 (a) Project Deliverable.
10 M
7 (b) Commissioning
10 M
7 (c) Software packages for Documentation.
10 M