1 (a) Define project and explain term predictability related to project.
5 M
1 (b) Explain conduit and tray schedule.
5 M
1 (c) Explain Sequential Function Chart (SFC) with example.
5 M
1 (d) Explain the role of designer.
5 M
1 (e) Explain ISA tagging process to indicate the instrument and its function.
5 M

2 (a) Explain Project planning in details.
10 M
2 (b) Draw and explain electronic and pneumatic loop writing diagram for level control loop.
10 M

Explain the following:
3 (a) (i) Junction box schedule
5 M
3 (a) (ii) Air header schedule.
5 M
3 (b) Explain Factory Acceptance Test and Site Acceptance test.
5 M

4 (a) Draw and explain hook up diagram for flow and temperature measurement.
10 M
4 (b) Explain in short HMI specification
10 M

5 (a) Explain the specification sheet for DP transmitter and control valve.
10 M
5 (b) Describe the different Standards used for instrumentation project.
10 M

6 (a) Draw and explain the Instrument location plans with example.
10 M
Explain the following project activity:
6 (b) (i) O & M manual
5 M
6 (b) (ii) Commissioning
5 M

Write a short note on any two:
7 (a) Project Deliverables
10 M
7 (b) Checkout procedure for Temperature transmitter and control valve.
10 M
7 (c) Software packages for Documentation.