Answer any one question from Q1 and Q2
1 (a)
Explain Macgregor's theory of X and Y for motivation.
4 M
1 (b)
Explain Maslow's need hierarchy theory of motivation.
6 M
2 (a)
What is the difference between programmed and non programmed decision?
4 M
2 (b)
What are various career fields possible for engineering graduates?
6 M
Answer any one question from Q3 and Q4
3 (a)
Explain the process of requirement analysis and specification process with the help of diagram.
4 M
3 (b)
Write short note on:
i) ISO 9000
ii) Six sigma
i) ISO 9000
ii) Six sigma
6 M
4 (a)
State the difference between:
i) High level design and detailed design.
ii) Unit testing and integration testing.
i) High level design and detailed design.
ii) Unit testing and integration testing.
6 M
Answer any one question from Q5 and Q6
5 (a)
Explain four major sections of project management plan.
8 M
5 (b)
Explain in short importance of cost management and time management in project execution.
8 M
6 (a)
Explain configuration management process in detail.
8 M
6 (b)
Explain activities tracking, defect tracking and issues tracking with respect to project tracking.
8 M
Answer any one question from Q7 and Q8
7 (a)
What are the various functional modules of an ERP system? Explain.
8 M
7 (b)
Explain any two implementation strategies for ERP in an organisation.
8 M
8 (a)
Explain ERP implementation Life Cycle.
8 M
8 (b)
List down 4 advantages and 4 myths of an ERP system.
8 M
Answer any one question from Q9 and Q10
9 (a)
Write short note on:
i) Trends in SCM
ii) Software maintenance
iii) Reverse engineering
i) Trends in SCM
ii) Software maintenance
iii) Reverse engineering
12 M
9 (b)
What is software project auditing process and why it is essential?
6 M
10 (a)
Write short note on:
i) Re-engineering
ii) Business process management
iii) Project management tools.
i) Re-engineering
ii) Business process management
iii) Project management tools.
12 M
10 (b)
What is Software Process Improvement?
6 M