1 (a)
Explain the various types of water demand.
8 M
1 (b)
What is meant by per capita demand? Mention the factors that affect per capita demand.
6 M
1 (c)
What is meant by design period? Discuss the factors affecting design period.
6 M
2 (a)
Describe the incremental method of estimating the population of a locality.
6 M
2 (b)
Mention the different sources of water supply. Give the factors governing the solution of a particular source of water.
6 M
2 (c)
What is an intake? Explain the factors governing the location of an intake.
8 M
3 (a)
Enumerate the various physical and chemical characteristics of testing of raw water supplies.
8 M
3 (b)
Give the drinking water standards for the following parameters. Discuss their effect when they exceed their limits: i) Turbidity ii) Hardness iii) Chlorides iv) Fluoride.
8 M
3 (c)
Explain the method of sampling of water.
4 M
4 (a)
Briefly explain the complete treatment process of a water supply scheme with flow chart.
6 M
4 (b)
What is aeration? Explain the type of acrators.
6 M
4 (c)
Describe briefly the various constituents of coagulation - sedimentation plant.
8 M
5 (a)
With the help of a neat sketch, explain the working of Rapid gravity filter.
10 M
5 (b)
Design six show sand filters beds from the following data:
Population to be served = 50000 persons; per capita demand=150 lped;
Rate of filtration = 180 litres/hr/sq.m; Length of each bed = Twice the breath.
Assume maximum demand as 1.8 times the average daily demand. Also assume that one unit, out of six, will be kept as stand by.
Population to be served = 50000 persons; per capita demand=150 lped;
Rate of filtration = 180 litres/hr/sq.m; Length of each bed = Twice the breath.
Assume maximum demand as 1.8 times the average daily demand. Also assume that one unit, out of six, will be kept as stand by.
10 M
6 (a)
Explain briefly the following processes: i) Break point chlorination ii) super chlorination.
10 M
6 (b)
Mention the methods of softening the water. Describe zeolite process of softening water in detail.
10 M
7 (a)
Explain briefly: i) De-fluoridation ii) Desalination.
10 M
7 (b)
With sketches, explain briefly dead end system grid iron system of distribution networks.
10 M
Write short notes on:
8 (a)
Fire hydrant.
5 M
8 (b)
Pressure release valve.
5 M
8 (c)
Metering in distribution system.
5 M
8 (d)
Jar test.
5 M