GTU Civil Engineering (Semester 6)
Water & Waste Water Engineering
December 2014
Total marks: --
Total time: --
INSTRUCTIONS
(1) Assume appropriate data and state your reasons
(2) Marks are given to the right of every question
(3) Draw neat diagrams wherever necessary


1 (a) Explain River intake.
7 M
1 (b) Draw schematic layout plan of water treatment plant and Shaw different units
7 M

2 (a) Describe rising main and pumping station . Also describe design steps.
7 M
2 (b) Explain design criteria for rapid sand filter.
7 M
2 (c) The purification plant has estimated 11 mld Design the dimension of suitable plain sedimentation tank.
7 M

3 (a) Explain clariflocculator with sketch.
7 M
3 (b) Describe mass curve method to find capacity of elevated service reservoir.
7 M
3 (c) Explain methods of disinfections.
7 M
3 (d) Design sludge digestion tank with following data
(i) Average flow of sewage = 50 × 106 litres/day.
(ii) Total suspended solids = 300 mg/l
(iii) Volatile suspended solids = 200 mg/l
(iv) Moisture content =85% . Assume other data
7 M

4 (a) Explain trickling filter with sketch . discuss design parameters.
7 M
4 (b) Explain Activated sludge digestion process.
7 M
4 (c) Explain design procedure of septic tank
7 M
4 (d) Explain aerobic attached growth treatment process.
7 M

5 (a) Explain sludge drying beds.
7 M
5 (b) Describe Grit chamber by giving design criteria.
7 M
5 (c) With sketch describe different types of sewer.
7 M
5 (d) Explain Flash Mixer with sketch. Also discuss design criteria.
7 M