GTU Electrical and Electronic Engineering (Semester 8)
Testing And Installation Of Electrical Equipments And Systems
June 2015
Total marks: --
Total time: --
INSTRUCTIONS
(1) Assume appropriate data and state your reasons
(2) Marks are given to the right of every question
(3) Draw neat diagrams wherever necessary


1 (a) State the standard method of designation of cooling of an electrical rotating machine as per IEC recommendations.
7 M
1 (b) What are the power quality disturbances in voltage? Also write its causes and remedies
7 M

2 (a) State the significance of safety precautions and explain management's responsibility.
7 M
Answer any two question from Q2 (b) or Q2 (c)
2 (b) Explain the procedure of dismantling of a large rotating machine dispatched in fully assembled condition. What are the checks after dismantling?
7 M
2 (c) What is synchronizing of a synchronous generator with busbars? What are the required conditions for instant of synchronizing?
7 M

Answer any two question from Q3 (a), (b) or Q3 (c), (d)
3 (a) Explain the working principle of megger with necessary figure and procedure of its use.
7 M
3 (b) What is load shedding? Why is it necessary? How is it carried out and where?
7 M
3 (c) Explain the procedure of acceptance and storage of induction motor.
7 M
3 (d) Explain the seven principles for safety management.
7 M

Answer any two question from Q4 (a), (b) or Q4 (c), (d)
4 (a) What is cyclic duration factor? Explain with standard notations. Explain the term MRC, STR and DTR for rotating electrical machines.
7 M
4 (b) Explain the procedure of drying out of electric motor using the
(1) radiating lamp
(2) drying chambers and resistor heaters.
7 M
4 (c) Explain the main functions of SCADA.
7 M
4 (d) Describe the test setup for impulse testing of power transformers with necessary figure.
7 M

Answer any two question from Q5 (a), (b) or Q5 (c), (d)
5 (a) State the conditions for which HVDC Links are preferred?
7 M
5 (b) Describe capacitance bridge method for locating cable faults with necessary circuit diagram.
7 M
5 (c) Explain the procedure of design of transmission towers and structures.
7 M
5 (d) Explain the procedure of investigation of power quality.
7 M