GTU Computer Engineering (Semester 6)
Software Engineering
December 2014
Total marks: --
Total time: --
INSTRUCTIONS
(1) Assume appropriate data and state your reasons
(2) Marks are given to the right of every question
(3) Draw neat diagrams wherever necessary


1 (a) Describe FOUR Ps for Project Management and explain any THREE in detail.
7 M
1 (b) What does CASE stands for? Explain all the CASE components.
7 M

2 (a) Define Software Engineering. Draw and explain Software Engineering layers.
7 M
2 (b) Write and explain briefly possible reasons for project failure.
7 M
2 (c) Describe two main features of Spiral model and discuss working of Prototyping model with its diagram.
7 M

3 (a) Discuss umbrella activities and its role in software development life cycle (SDLC).
7 M
3 (b) Explain W5HH principle with respect to software project management.
7 M
3 (c) Draw context diagram and data flow diagram (DFD) for Airlines Reservation System.
7 M
3 (d) What is Software Reliability? Compare Black Box testing and White Box testing in software product.
7 M

4 (a) Prepare an E-R diagram for a Hospital Management System.
7 M
4 (b) Describe process of requirement engineering in detail.
7 M
4 (c) Discuss all generic frame work activities of software engineering with respect to any one process model.
7 M
4 (d) What is testing? What is debugging? Draw the spiral diagram showing testing strategies with phases of software development.
7 M

5 (a) Draw database design model and discuss Architectural design and Interface design.
7 M
5 (b) What is User Interface (UI)? Explain the design model for UI.
7 M
5 (c) Discuss Incremental process model with its diagram and compare with Waterfall Model.
7 M
5 (d) Define Software Quality Assurance (SQA) and explain SQA activities.
7 M



More question papers from Software Engineering
SPONSORED ADVERTISEMENTS