1(a)
State when simulation is appropriate
5 M
1(b)
Define : System and Model.
5 M
1(c )
Explain the properties of Poisson process.
5 M
1(d)
Distinguish between
(i)Activity and Delay
(ii)Random Numbers and Random Variant
(i)Activity and Delay
(ii)Random Numbers and Random Variant
5 M
2(a)
Explain steps in simulation study along with the flowchart.
10 M
2(b)
Explain Naylor and Finger validation approach.
10 M
3(a)
Explain different types of simulation with respect to output analysis.
10 M
3(b)
Explain in detail an evaluation and selection technique for simulation software.
10 M
4(a)
Records pertaining to monthly number of jobs related injuries at Chemical plant were being studied by an NGO. The value for past 100 months were as follows:
Apply the Chi-square goodness of fit test to these data to test the hypothesis that the underlying distribution is poisson. Use level of significance ?=0.05
Apply the Chi-square goodness of fit test to these data to test the hypothesis that the underlying distribution is poisson. Use level of significance ?=0.05
10 M
4(b)
Explain overall structure of an event scheduling for simulation program with the help of necessary flowchart
10 M
5(a)
Explain in detail method of batch means of interval estimation in steady state simulation.
10 M
5(b)
Explain long run measures of Performance of Queuing system.
10 M
6(a)
Explain multiuser queuing system with suitable example.
10 M
6(b)
Explain steps involved in development of useful model of input data
10 M
Write short notes on any two of the following:-
7(a)
Inverse Transform Technique
10 M
7(b)
Terminating and Non-Terminating Simulation.
10 M
7(c)
Verification and Validation process.
10 M
7(d)
Features of GPSS
10 M