GTU Mechanical Engineering (Semester 6)
Industrial Engineering
May 2015
Total marks: --
Total time: --
INSTRUCTIONS
(1) Assume appropriate data and state your reasons
(2) Marks are given to the right of every question
(3) Draw neat diagrams wherever necessary


1 (a) Discuss the factors to be considered for the selection of the site for textile Industry.
7 M
1 (b) Differentiate between product layout and process layout.
7 M

2 (a) Explain the various functions of production planning and control.
7 M
Answer any two question from Q2 (b) or Q2 (c)
2 (b) What is sales forecasting? List various methods of sales forecasting and explain exponential smoothing method.
7 M
2 (c) Write short note on "line of balancing".
7 M

Answer any two question from Q3 (a), (b) or Q3 (c), (d)
3 (a) Differentiate between method study and work measurement. How is productivity increased by these methods?
7 M
3 (b) Explain outline process chart and flow process chart.
7 M
3 (c) Briefly discuss multiple activity chart with their objectives.
7 M
3 (d) Discuss the procedure establish standard time for completion of a job.
7 M

Answer any two question from Q4 (a), (b) or Q4 (c), (d)
4 (a) List the various Therbligs with their symbols. Explain applications of micro motion study.
7 M
4 (b) Distinguish between job evaluation and merit rating. Discuss its importance and objectives.
7 M
4 (c) Define SQC. Write short note on "Operating Characteristics curve".
7 M
4 (d) State different types of control charts used for variables and attributes type of characteristics. Explain any one in detail.
7 M

Answer any two question from Q5 (a), (b) or Q5 (c), (d)
5 (a) Define wages. Explain in brief various types of incentives.
7 M
5 (b) Explain various characteristics of entrepreneur.
7 M
5 (c) Write short note on single and multiple sampling plan.
7 M
5 (d) Write in brief about Industrial dispute act 1947.
7 M



More question papers from Industrial Engineering
SPONSORED ADVERTISEMENTS