1(a)
What is the difference between Ports and harbors? Draw the sketch of artificial Harbor showing all components.
7 M
1(b)
Describe the advantages and disadvantages of water transport. Give the list of major ports in India.
7 M
2(a)
Explain wind coverage and crosswind components. Draw the sketch showing aero plane components.
7 M
Solve any one question from Q.2(b) & Q.2(c)
2(b)
Explain by drawing sketch aircraft dimensions height, wingspan and length
7 M
2(c)
What is necessity of dredging ? explain mechanical and hydraulic dredgers.
7 M
Solve any one question from Q.3 & Q.4
3(a)
Define the terms :- (i) Free port (ii) Marine terminal (iii) Off-shore moorings (iv) Gross Registered Tonnage (v) Jetty or pier (vi) fenders (vii) anchorage area
7 M
3(b)
Explain by drawing sketch vertical wall type and composite break water
structures.
7 M
4(a)
What is necessity of navigational aids in oceanic transportation; draw the sketch of 'light house.'
7 M
4(b)
Describe wet docks and dry docks. Draw the sketch of graving dry-dock.
7 M
Solve any one question from Q.5 & Q.6
5(a)
Explain in detail "basic runway length" for normal landing and normal takeoff cases.
7 M
5(b)
The length of runway at sea level under standard atmospheric conditions and
zero gradient is 1500 m. The airport site is 900 m above mean sea level. The reference temperature is 20°c If proposed runway permits gradient of 0.2 percent determine the actual length of runway.
7 M
6(a)
What is necessity of airport marking & runway marking? Draw layout of Runway taxiway shoulder marking.
7 M
6(b)
Explain by drawing sketch wind rose diagram showing direction, duration and intensity of any particular place.
7 M
Solve any one question from Q.7 & Q.8
7(a)
Enlist the surveys to be carried out for site selection of an airport. Describe factors to be considered for suitable site of an airport.
7 M
7(b)
Describe by drawing sketch airport terminal building.
7 M
8(a)
Give the outline as per ICAO master planning process for planning of airports.
7 M
8(b)
Give the outline as per ICAO master planning process for planning of airports.
7 M