1 (a)
What is need of construction management? Discuss objectives of construction management.
7 M
1 (b)
Classify construction equipments on different basis with suitable examples.
7 M
2 (a)
Explain WBS of construction project. Discuss importance of WBS.
7 M
Solve any one question from Q2(b) & Q2(c)
2 (b)
State limitations of bar chart. What is Line Of Balance. State its application.
7 M
2 (c)
Explain:
1. Grade resistance
2. Coefficient of traction
3. Rimpull.
1. Grade resistance
2. Coefficient of traction
3. Rimpull.
7 M
Solve any two question from Q3(a), Q3(b) & Q3(c), Q3(d)
3 (a)
Explain dummy activity. State types of dummy activities with examples.
7 M
3 (b)
Draw AOA diagram for following data. Determine
1. critical path
2. project duration
3. Prepare table of floats.
1. critical path
2. project duration
3. Prepare table of floats.
Activity (i-j) | 1-2 | 2-3 | 2-4 | 3-4 | 3-5 | 4-5 |
Duration in days | 8 | 12 | 4 | 6 | 10 | 6 |
7 M
Differentiate between:
3 (c) (i)
CPM and PERT.
4 M
3 (c) (ii)
Resource smoothening and resource leveling
4 M
3 (d)
Determine optimum cost and corresponding project duration for the given data.
Activity | Normal time | Normal cost | Crash time | Crash cost |
1-2 | 3 | 12000 | 2 | 16000 |
1-3 | 6 | 18000 | 3 | 24000 |
2-4 | 2 | 20000 | 1 | 23000 |
3-4 | 4 | 16000 | 2 | 21000 |
4-5 | 5 | 30000 | 4 | 35000 |
Indirect cost = Rs. 3000/day |
7 M
Solve any two question from Q4(a), Q4(b) & Q4(c), Q4(d)
4 (a)
Enlist methods of depreciation. Explain any one method with suitable example.
7 M
4 (b)
Classify bulldozers. State uses of bulldozers on construction projects.
7 M
4 (c)
Differentiate between power shovel and dragline with sketches.
7 M
4 (d)
Discuss factors affecting output of HOE.
7 M
Solve any two question from Q5(a), Q5(b) & Q5(c), Q5(d)
5 (a)
What is job layout? State factors affecting job layout.
7 M
5 (b)
Classify dump trucks on method of dumping. State selection factors for rear dump trucks.
7 M
5 (c)
Sketch typical belt conveyor system. Explain functions of following components of BCS.
1. Idlers
2. Feeder
3. Snub pulley.
1. Idlers
2. Feeder
3. Snub pulley.
7 M
5 (d)
Discuss safety measures for 1. Excavation. 2. Demolition.
7 M
More question papers from Construction management and Equipments