GTU Civil Engineering (Semester 4)
Building Construction
May 2015
Total marks: --
Total time: --
INSTRUCTIONS
(1) Assume appropriate data and state your reasons
(2) Marks are given to the right of every question
(3) Draw neat diagrams wherever necessary


1 (a) Describe various causes of failure of foundation and their remedial measures.
7 M
1 (b) Give a point wise comparison between stone and brick masonry.
7 M

2 (a) Write short note on
(1) Ashlar masonry
(2) Rubble masonry
7 M
Answer any one question from Q2 (b) & Q2 (c)
2 (b) Describe objectives of subsurface investigation and discuss wash boring in detail.
7 M
2 (c) Define the following terms
(1) Header (2) Stretcher (3) Corbel (4) Coping (5) Throating (6) Quoin header (7) Cornice
7 M

Answer any two question from Q3 (a), (b) & Q3 (c), (d)
3 (a) Describe a point wise comparison between English bond and Flemish bond.
7 M
3 (b) Write a short note on
(1) Hollow concrete block construction
(2) Cavity walls
7 M
3 (c) Draw a label diagram of typical door and define its each component.
7 M
3 (d) Describe the factors affecting selection of size, shape and location of window.
7 M

Answer any two question from Q4 (a), (b) & Q4 (c), (b)
4 (a) rite a short note on (with figure)
(1) Louvered window
(2) Bay Window
7 M
4 (b) Define the following terms in relation of stairs
(1) Tread (2) Riser (3) Going (4) Scotia (5) Baluster (6) String (7) Waist
7 M
4 (c) Describe the factors affecting the selection flooring material.
7 M
4 (d) Write a short note on
(1) Timber flooring
(2) Reinforced concrete flooring
7 M

Answer any two question from Q5(a), (b) & Q5 (c), (d)
5 (a) Define the following terms in relation to roof
(1)Ridge (2) Valley (3) Eaves (4) Common rafter (5) Purlin (6) Cleat (7) Gable
7 M
5 (b) Write a short note on
(1) Roof covering (2) Queen post roof truss
7 M
5 (c) Write a short note on:
1) Pointing
(2) Plastering
7 M
5 (d) Write a short note on
(1) Scaffolding
(2) Underpinning
7 M



More question papers from Building Construction
SPONSORED ADVERTISEMENTS